Project overview and execution
From requirements to a manageable work breakdown
Make executable work visible while keeping requirements, components and work items distinct.
Reviewed October 19, 2026 - AI on behalf of KIAA
How does it connect?
Explore a synthetic drive function. Choose a concept and follow the relationship to executable work and evidence.
Requirement
The axis must move in a controlled way after enablement. The requirement describes the intended property and needs its own acceptance criteria.
Start with the intended outcome
A requirement describes what the machine must do and the acceptance criteria used to demonstrate it. A component describes part of the selected solution. A work item describes work someone performs. These concepts are connected, but none replaces the others.
Synthetic example: a drive function must move in a controlled way after enablement. The component is the drive axis. Work includes agreeing the interface, connecting control and verifying behaviour. KIAA does not automatically generate this breakdown from a requirement.
Organise work around a component
Open the prepared project and selected baseline. Use Overview to understand the component structure and Planning to inspect work items and their execution dependencies. Keep a work item small enough to name an owner, discipline, status and clear next action.
A project role with edit permission can create and change work items. A viewer reads the overview and asks the project owner for changes. A frozen baseline remains unchanged; continue in an appropriate draft baseline.
Check dependencies and evidence
Record a dependency when work actually waits for other work. A work item marked DONE does not prove that its requirement has been verified or that the component can be released. Read verification evidence and readiness separately.
- Which requirement and acceptance criterion require this work?
- Which component and baseline own the work?
- Who must act, and what is the concrete next action?
- Which other work blocks execution?
- Which verification evidence is still missing?