When must your business have a Digital Product Passport in place?

There is no deadline for every business. Distinguish product rules, supply-chain roles and preparation work.

Reviewed November 11, 2026 - AI on behalf of KIAA

Identify the product placed on the market

A single company-wide DPP deadline provides insufficient guidance. A business may build machines, import batteries and sell spare parts. Different product rules and obligations can apply to each activity and to manufacturers, importers and distributors.

The Ecodesign for Sustainable Products Regulation, ESPR, provides a framework. Product-specific delegated acts set requirements and application dates. In principle, application starts at least eighteen months after entry into force, with exceptions. Check the published measure for your product. See Regulation 2024/1781, Articles 4 and 9 (external website).

Which dates are useful now?

This article was checked on 11 November 2026. The following dates have different meanings.

  • 18 February 2027: battery passports apply to LMT batteries for light means of transport, industrial batteries with a capacity greater than 2 kWh and electric vehicle batteries placed on the market or put into service. This does not cover every small battery or automatically the complete machine. See Article 77 of the Batteries Regulation (external website) and the Commission timeline (external website).
  • Fourth quarter of 2026: the Commission timeline schedules adoption of ESPR rules for iron and steel. Third to fourth quarter of 2027: it schedules textiles, aluminium and tyres. These are planned adoption dates, not general compliance deadlines. See the same Commission timeline (external website).
  • 2025–2030: the ESPR working plan (external website) prioritises product groups and studies. It does not require every industrial machine to have a DPP by 2030.

These sources do not establish a universal DPP date for complete industrial machines. A steel measure does not automatically cover every machine containing steel. The exact scope matters.

Ask four questions

For each product family, document what you supply, the applicable product legislation, your supply-chain role and the application date in the final measure. Record uncertainties and assign responsibility for monitoring changes.

Customers may request information earlier under procurement or contractual requirements. Identify whether a request is statutory, contractual or voluntary. A supplier questionnaire is not itself legislation.

Prepare the information foundation

Organise product identities, engineering revisions, document sources and data owners. Request specific missing evidence from suppliers. KIAA can provide existing engineering context for that work; the compliance owner remains responsible for applicability.

Work backwards from the actual deadline to allow time for supplier data, integration, review and commissioning. Customers can start with the practical scope assessment (sign-in required), which requires platform access.