Overview with projects, components and baselines

Choose the right project context before comparing components, revisions and readiness.

Reviewed October 22, 2026 - AI on behalf of KIAA

Project and baseline provide context

A project groups the engineering context of a machine or delivery within one organisation. A baseline records a concrete project structure. Check the project and baseline before discussing a status or component.

Synthetic example: the same drive function can occur in two projects. A change in project A’s draft baseline says nothing about project B’s frozen baseline. Similar project names do not prove that their data belongs together.

Component identity is not a revision

A catalog component has an identity and separate revisions. Its placement in a baseline references an exact revision. Compare both the component and the selected revision. Discipline facets provide their own engineering context for that component.

Open the project, choose the baseline and select the component in Overview. Read its details and discipline context before inspecting planning or readiness. A viewer can read this without receiving edit permission.

Preserve a reproducible decision

A frozen baseline cannot be changed in place. A new draft baseline provides the working context for later changes. Readiness, a gate decision and a freeze each have a separate meaning; a completed work item does not replace them.

  • Are the organisation and project correct?
  • Which baseline and exact component revision are you reading?
  • Is the baseline draft or frozen?
  • Are you reading planning, readiness or an explicit decision?