Make dependencies visible before they block planning

Clarify what work is waiting for and keep execution order separate from engineering readiness.

Reviewed October 27, 2026 - AI on behalf of KIAA

Name the concrete reason for waiting

An execution dependency connects work items that must run in a particular order. Describe what the successor needs from its predecessor. An arrow does not replace an agreement with an owner.

Synthetic example: a software test waits for confirmation of an electrical signal connection. The signal check is the predecessor; the software test is the successor. Do not turn every engineering relationship into a planning dependency.

Read planning within the same baseline

Open Planning within the project and selected baseline. Follow the work item’s incoming and outgoing relationships. Use the table to compare row details and the graph to follow connections. Check filters before concluding that a relationship is missing.

Only an authorised project role can change work items and dependencies. The server enforces project scope and rejects cycles. A viewer continues to read; a project role does not grant organisation administration.

Avoid an unsupported delivery promise

Planning shows execution context and critical dependencies. It is not an automatic resource planner and does not guarantee a delivery date. An engineering dependency between discipline facets and a dependency between work items are different relationships. Read readiness and verification evidence separately.

  • What must the predecessor demonstrably deliver?
  • Who handles the blocker?
  • Are the project, baseline and filters correct?
  • Is execution complete, and is the required evidence present?